aluminum spacer blocks not needed after all.jpg |
APF dome from dorm walkway.jpg |
back together, put on chain bucket.jpg |
center cross beam needs to be removed.jpg |
coating tank opened and inspected.jpg |
counter weights placed by strongman.jpg |
good clearance of fixture hooks, both sides.jpg |
handling fixture holes needed retapping.jpg |
have to take hoist apart to do it.jpg |
hit-and-miss hand drilled detent holes.jpg |
hoist bigger than we thought.jpg |
how do we get big hoist onto I-beam.jpg |
it fits almost.jpg |
mt men frightened by instrument makers.jpg |
nice day, thats the Sierras.jpg |
remounted fixture hooks,no spacer,shorter bolts.jpg |
rotation lock plate needs to be removed.jpg |
rotation lock plate removed.jpg |
skilled craftsmen tighten bolts.jpg |
slide beam in hoist, lift with frklift.jpg |
somthing needed t to center mounts.jpg |
tank baffle stiffener clears back of fixture.jpg |
test fitting fixture mounts.jpg |
test lift fixture into place.jpg |
test positioning of handling cart.jpg |
the business end of the tank.jpg |
this has to come out.jpg |
Thompson having too much fun.jpg |
two pinch clamps and center into detent.jpg |